Total, complete and comprehensive construction solution.

Customers will minimize risks in quality management, delivery schedules, and investment budgets since we are committed to accountability and have successfully implemented many projects.

Our project managers have engineering degrees, management certifications, and many years of experience. Be well-trained, have a sense of responsibility, exercise great vigilance, and follow standard procedures to ensure safety and quality for the project.

We understand the overall cost and value of the investment project, from which we will provide appropriate design and construction solutions at each stage, reducing unnecessary costs and limiting risks. Besides, we can offer solutions for investors to choose from.

MANAGEMENT SYSTEM
MANAGEMENT SYSTEM

First Green Engineering constantly improves and innovates management method with speciallized softwares ERP, quality management system according to international standards ISO 9001:2015 in order to serve management more and more effectively, meet the requirements of the quality and progress of the projects while minimizing the risks arising. All transactions, cash flow control, material ordering, payment process, ... we work on ERP.

EQUIPMENT CAPACITY
EQUIPMENT CAPACITY

In addition to owning a full range of Machinery and equipment for construction, measuring, and adjusting parameters accurately according to the drawings and investor’s requirements, First Green Engineering also owns a mechanic workshop helping us be proactive in the source of materials and ready to meet the needs of M&E design and construction. From that, First Green Engineering would be willing to bring customers the best quality products at the most reasonable price.

Construction machinery and equipment are extremely important for a company specializing in M&E construction, like First Green Engineering. These are the factors that help to improve working productivity, reform construction methods as well as manage the measurement, and accurate inspection of the construction process of all projects.

SAFETY CULTURE
SAFETY CULTURE

First Green Engineering fully understands and ensures labor safety in all projects, fostering labor safety and environmental protection in accordance with international standards. This is one of the activities that can realize First Green Engineering's comprehensive commitment. We strive to improve annually:

  • Labor safety policy

  • Safety control procedure

  • Training plan

  • Supervise, periodically review and update procedures

  • Build a safety report system

WHAT WE BRING
Specialized Skills
Specialized Skills
Offering high-level expertise in executing and installing MEPF systems, ensuring accuracy and efficiency.
Reliability and Quality
Reliability and Quality
Ensuring reliability and quality in executing MEPF projects, from material selection to installation and testing.
Adherence to Regulations and Standards
Adherence to Regulations and Standards
Ensuring that constructed systems comply with technical standards, regulations, and legal requirements.
Performance and Efficiency
Performance and Efficiency
Ensuring that constructed systems operate at high efficiency and save energy, thus reducing operational costs.
Consultation and After
Consultation and After
Construction Support: Providing guidance and support after project completion, including user manuals, maintenance, and repair assistance.
Flexible and Customized Solution
Flexible and Customized Solution
Ability to meet clients' customized requirements and propose flexible solutions for MEPF systems.
WHAT WE DO
Construction MEPF system
Construction MEPF system

At First Green Engineering, there is a combination of dynamic, enthusiastic, dedicated, and experienced elements. Engineers had the opportunity to learn, research, and innovation. Advancing and applying many new technological techniques to management and construction work, creating a multi-colored and flexible technical team, in order to improve work efficiency and meet the most stringent technical requirements from the investor.

What we do:

  • Mechanical system.

  • Electrical system.

  • Firefighting System.

  • Plumbing system.

  • Utility System.

  • Building modeling (BIM).

  • Computational Fluid Dynamics (CFD).

  • Especially cleanroom for pharmaceutical projects, food industries, healthcare, GSP warehouse, ...

Testing and Commissioning (T&C)
Testing and Commissioning (T&C)

To ensure the integrity of each project upon handover and re-evaluation, we have built a professional T&C team that is trained and fully equipped with equipment and machinery to meet regulatory requirements. Standardization according to the instructions of international standards such as Smacna, Cibse, TCVN, Leed, Green Mark, etc., and ensuring all products and systems used by customers are completed as required.

Manufacturing and <br>Trading Engineering Industries
Manufacturing and
Trading Engineering Industries

Along with the development of the M&E industry, from the very first day of establishment, we have always focused on product quality, constantly improving processes and techniques... to improve product quality to meet market needs as well as ensuring the benefits of customers with the desire to become a leading company in manufacturing and providing the most suitable and quality electromechanical products. And thereby forming the strength of the First Green Engineering brand.

LI CHENG ENTERPRISE VIETNAM CO., LTD FACTORY
LI CHENG ENTERPRISE VIETNAM CO., LTD FACTORY
LI CHENG ENTERPRISE VIETNAM CO., LTD FACTORY
LI CHENG ENTERPRISE VIETNAM CO., LTD FACTORY
LI CHENG ENTERPRISE VIETNAM CO., LTD FACTORY
LI CHENG ENTERPRISE VIETNAM CO., LTD FACTORY
LI CHENG ENTERPRISE VIETNAM CO., LTD FACTORY
LI CHENG ENTERPRISE VIETNAM CO., LTD FACTORY
  • Year 2020
  • Client Le Gia Phuc Construction and Trading Co., Ltd
  • Scale Land area: 81,987 sqm. Construction area: 38,363 sqm
  • Location Nhon Trach 6 IP, Nhon Trach District, Dong Nai Province
  • Scope Supply and installation of M&E system & construction implementation on BIM model
OPV PHARMACEUTICAL FACTORY
OPV PHARMACEUTICAL FACTORY
  • Year 2016
  • Client OPV Pharmaceutical., JSC
  • Scale 2,000 sqm, 2 floors of GMP factory
  • Location Dong Nai Province, Viet Nam
  • Scope Installation of replacement, improvement of the electrical system
ONEHUB SAIGON (LEED)
ONEHUB SAIGON (LEED)
  • Year 2018
  • Client Newtecons Investment Construction., JSC
  • Scale 01 basement, 07 floors
  • Location Sài Gon High Tech Park, Thu Duc City, Ho Chi Minh City
  • Scope Supply, installation heating ventilating and air conditioning system
TAKA PLAZA SHOPPING MALL CENTER
TAKA PLAZA SHOPPING MALL CENTER
  • Year 2015
  • Client Anh Le Brothers Co., Ltd
  • Scale 1,500 sqm ,3 floors, 1 basement
  • Location District 3, Ho Chi Minh City
  • Scope Installation of heating ventilating and air conditioning system
NAM THONG VILLA
NAM THONG VILLA
NAM THONG VILLA
  • Year 2017
  • Client Steelman Partner
  • Scale 300 sqm – Luxury Smart Home Villa
  • Location Phu My Hung Ward, District 7, Ho Chi Minh City
  • Scope Supply and installation of M&E system
(M-ONE) TAN KIENG
(M-ONE) TAN KIENG
  • Year 2017
  • Client Unicons Construction Investment Co., Ltd
  • Scale 2 blocks, 25 floors, 900 apartments
  • Location Tan Kieng Ward, District 7, Ho Chi Minh City
  • Scope Supply and installation of semi-package of heating ventilating and air conditioning system
PHUNG COMPLEX HOTEL
PHUNG COMPLEX HOTEL
  • Year 2020
  • Client Ha Dat Co., Ltd
  • Scale 10 floors, 1 basement, total construction area 6,100 sqm
  • Location Phu Thuy Ward, Phan Thiet City, Binh Thuan Province
  • Scope Supply and installation of M&E system
LOC TROI OFFICE
LOC TROI OFFICE
LOC TROI OFFICE
LOC TROI OFFICE
LOC TROI OFFICE
  • Year 2017
  • Client Thanh Vinh Furniture Decoration Trading Co., Ltd
  • Scale Total area 5,000 sqm including AHU VAV system
  • Location Dai Quang Minh, Thu Duc City, Ho Chi Minh City
  • Scope Supply of labours, materials, installation equipment of heating ventilating and air conditioning system
152 DIEN BIEN PHU OFFICE BUILDING
152 DIEN BIEN PHU OFFICE BUILDING
  • Year 2019
  • Client Nam Thinh Mechanical Electrical Refrigeration., JSC
  • Scale Including 2 towers from 23 to 27 floors, 2 basements, 4 floors of podiums, total area of about 6,000 sqm
  • Location 152 Dien Bien Phu, Ward 25, Binh Thanh District, Hồ Chí Minh City
  • Scope Installation of heating ventilating and air conditioning system
OFFICE BUILDING BELONG TO CITY GATE HIGH-RISE APARTMENT PROJECT
OFFICE BUILDING BELONG TO CITY GATE HIGH-RISE APARTMENT PROJECT
  • Year 2020
  • Client Hung Thanh Construction - Trading – Service - Manufacturing Co., Ltd
  • Scale 12 floors, 1 mezzanine, 1 technical floor and 1 basement
  • Location Vo Van Kiet Avenue, Ward 16, District 8, Ho Chi Minh City
  • Scope Supply, installation of M&E system
XUYEN A GENERAL HOSPITAL – TAY NINH
XUYEN A GENERAL HOSPITAL – TAY NINH
  • Year 2019
  • Client Xuyen A Hospital Investment., JSC
  • Scale 41,000 sqm, 10 floors, and over 1,000 beds
  • Location Thanh Phuoc Commue, Go Dau Ward, Tay Ninh Province
  • Scope Supply and installation of air handling system of the operating room
XUYEN A GENERAL HOSPITAL –   LONG AN
XUYEN A GENERAL HOSPITAL – LONG AN
  • Year 2020
  • Client Xuyen A Hospital Investment., JSC.
  • Scale 110,000 sqm, 10 floors, and over 1,000 beds
  • Location Hau Nghia, Duc Hoa Ward, Long An Province
  • Scope Supply and installation of air handling system of operating room
LAVIE FACTORY
LAVIE FACTORY
  • Year 2014
  • Client Nestle Water
  • Scale 3,000 sqm
  • Location Tan An, Long An Province
  • Scope Installation of heating ventilating and air conditioning system
VINH HAO MINERAL WATER FACTORY
VINH HAO MINERAL WATER FACTORY
  • Year 2014
  • Client Vinh Hao Mineral Water., JSC
  • Scale 500 sqm
  • Location Vinh Son Hamlet, Vinh Hao Commune, Tuy Phong District, Binh Thuan Province
  • Scope Installation of heating ventilating and air conditioning system
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
NAM NGU FISH SAUCE FACTORY
  • Year 2016
  • Client Masan Group
  • Scale 4,000 sqm
  • Location Phu Quoc City, Kien Giang Province
  • Scope Installation of heating ventilating and air conditioning system
MARUZEN FOOD FACTORY
MARUZEN FOOD FACTORY
  • Year 2016
  • Client Viet Duy Construction Co., Ltd
  • Scale 5,000 sqm
  • Location My Phuoc III IP, Ben Cat District, Binh Duong Province
  • Scope Improvement of the electrical system and air ventilation in the workshop
NUTRI FARM NGHE AN
NUTRI FARM NGHE AN
NUTRI FARM NGHE AN
  • Year 2018
  • Client Masan Group
  • Scale 105 ha, 56 houses
  • Location Quy Hop District, Nghe An Province
  • Scope Install ventialtion system, bran storage center, automatic feeding system
JAKOB SAI GON
JAKOB SAI GON
JAKOB SAI GON
  • Year 2019
  • Client Trung Hau Group
  • Scale 30.000 sqm
  • Location VSIP 2 Industrial Park, Tan Uyen, Binh Duong Province
  • Scope Supply and installation of electrical and heating ventilating and air conditioning system
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
SCHAEFFLER VIETNAM FACTORY
  • Year 2019
  • Client Newtecons Construction Investment., JSC
  • Scale High-tech factory with area 50,000 sqm
  • Location Amata Industrial Park, Dong Nai Province
  • Scope Installation of methanol system, factory rainwater drainage
MILLENNIUM QUANG NGAI
MILLENNIUM QUANG NGAI
MILLENNIUM QUANG NGAI
  • Year 2020
  • Client Tai Viet Tin Construction Co., Ltd
  • Scale 50,000 sqm
  • Location VSIP Industrial Park, Tịnh Phong Commune, Son Tinh District, Quang Ngai Province
  • Scope Supply and installation of technology cooling system for plastic injection machines
NGON CAFÉ FACTORY
NGON CAFÉ FACTORY
NGON CAFÉ FACTORY
NGON CAFÉ FACTORY
NGON CAFÉ FACTORY
NGON CAFÉ FACTORY
NGON CAFÉ FACTORY
  • Year 2022
  • Client Metecno Vietnam Co., Ltd
  • Scale 300 sqm
  • Location Cu Kuin Industrial Park, Draybhang Commune, Cu Kuin District, Daklak Province
  • Scope Supply, installation of heating ventilating and air conditioning system
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
MITEK 2 OFFICE
  • Year 2022
  • Client Viteccons Construction Investment., JSC
  • Scale Construction area: 1,870.3 sqm including 2 basements, 8 floors
  • Location A7, E-Office Park, Sang Tao Street, Tan Thuan Dong Ward, District 7, Ho Chi Minh City
  • Scope Supply, installation of M&E system & construction implementation on BIM model
A1A FACTORY OFFICE
A1A FACTORY OFFICE
A1A FACTORY OFFICE
  • Year 2019
  • Client Alliance One Apparel Co., Ltd
  • Scale Total area: 3,864 sqm with 2 floors
  • Location Chau Thanh District, Ben Tre Province, Vietnam
  • Scope M&E System Design Consultancy
EXIMBANK DATA CENTER
EXIMBANK DATA CENTER
  • Year 2015
  • Client Vietnam Export Import Commercial., JSC Bank
  • Scale 2,000 sqm, 4 floors complied to TIA942; TCVN: 9250 – 2012
  • Location Binh Duong Province, Vietnam
  • Scope M&E System Design Consultancy
FANG BROTHERS KNITTING FACTORY
FANG BROTHERS KNITTING FACTORY
FANG BROTHERS KNITTING FACTORY
FANG BROTHERS KNITTING FACTORY
FANG BROTHERS KNITTING FACTORY
FANG BROTHERS KNITTING FACTORY
  • Year 2017
  • Client Ricons Construction Investment., JSC
  • Scale 60,000 sqm, main factory 3 floors complied to Leed Gold
  • Location Tay Ninh Province
  • Scope M&E System Design Consultancy - BIM
Download Profile
Name of the document View / Download Update date
Profile Click 12/01/2024
Brochure BIM Click 12/01/2024
Brochure DC Click 12/01/2024
Brochure PH Click 12/01/2024